Lisi brick sign with the name of the building

LISI Medical

Adapting to the needs of an industrial world.

Facts & Stats

Building

Client

LISI Medical

Folder

Market Type

Science & Technology

Two diamonds

Square Footage

55,000 SF

Pin

Location

Big Lake, Minnesota

Check

Completion Date

2017

Glob

Global Impact Stat

750,000+ Orthopedics implants forged every year

Some of the key points for the MEP design included a full sprinkler system with fire pumps, hazardous material fire protection calculations, DI process water loop uniformly spaced taps, compressed air grid with uniform spaced tabs, and nitrogen and oxygen bulk storage and distribution piping.

Other components included a specialized smoke purge system, removable oil mist collection filters for the rooftop unit return air openings, an electrical power grid on manufacturing floor, and an emergency generator. Additionally, we designed a contained wash-down room that collected contaminated water in a tank to be pumped for offsite treatment.

Explore other projects

Big building exterior

4Front | Technology & Office Campus

Unique research spaces to discover tomorrow.

St. Jude Medical building

Abbott Laboratories | St. Jude Medical

Mixed-use technology research developed in nature.

People programming machines in laboratory

Bio-Techne | Research & Development Headquarters

Creating innovative tools for life science research.

Boston Scientific building second view

Boston Scientific | Maple Grove Campus

Maintaining strict tolerances to deliver successful services.

Calyxt building and street

Calyxt | Headquarters

Interconnected flex-facility to deliver a healthier option.

Cargill Tech West building entrance

Cargill | Tech West Analytical Lab

Maximizing collaboration through engagement.


Connect with us to discuss your next project

We are always ready to jump in on a complicated and challenging project or simply to connect and expand our networks.

MCE building