Posts Categorized: Arc Flash


Confidential Project C

Built in phases, this Tier 3 designed project includes a quad redundant electrical system supported by four generators with separate utility feeds. The quad redundancy supports continuous cooling and stays quad redundant down to the cabinet level to provide the building with flexibility and limits the stranded power.  IT floor design is averaged at 300

Confidential Project D

This large financial data center was fully designed and never built due to company mergers. The building consisted of two data room floors of almost 40,000 square feet each.  The mechanical and electrical systems are designed to Tier 4 redundancy.  Electrically, a tri-redundant system is supported by seven 2.5 MW generators with an ultimate build

Coloplast

Overlooking the Mississippi River on West River Road, Coloplast’s new North American headquarters sits atop a previously existing brownfield which now heralds a revitalization of Minneapolis’ North Side. The project included the renovation of an existing manufacturing facility and addition of two new structures to house sales and marketing, and research and product development. Michaud

Valspar

The Valspar Applied Science and Technology Center (VAST) project consisted of a 170,640 square foot renovation of the existing 5-story building located on the Valspar Technology Campus. The building restoration process was completed following Minnesota Historical Society structural rehabilitation requirements to preserve the historic integrity of the building. MCE provided full MEP design services for