Mission Critical Project 3

Completion Date October 2009

Square Footage 49,340 SF

Raised Floor Square Footage 10,000 SF

Tier Level Electrically – Tier III, Mechanically Tier III

Electrical Density –  300 watts/SF

UPS Configuration Four (4) individual systems (N+1), each consisting of two (2) 750 KVA modules connected in a parallel.  Supports IT load and continuous cooling.

Generators Four (4) 2 MW generators (N+1), each connected with four (4) independent utility services via closed transition switches.

Chillers –  Five (5) 300-ton, air chilled chillers (N+1).

Thermal Storage –  Two (2) 4,500 gallon storage tanks to provide continuous cooling chiller plant restart.