Mission Critical Project 3

Completion Date – October 2009
Square Footage – 49,340 SF
Raised Floor Square Footage – 10,000 SF
Tier Level – Electrically – Tier III, Mechanically Tier III
Electrical Density – 300 watts/SF
UPS Configuration – Four (4) individual systems (N+1), each consisting of two (2) 750 KVA modules connected in a parallel. Supports IT load and continuous cooling.
Generators – Four (4) 2 MW generators (N+1), each connected with four (4) independent utility services via closed transition switches.
Chillers – Five (5) 300-ton, air chilled chillers (N+1).
Thermal Storage – Two (2) 4,500 gallon storage tanks to provide continuous cooling chiller plant restart.