Mission Critical Project 2

Completion Date – Phase I – 2008
Square Footage – 156,000 SF (Expandable to 256,000 SF)
Raised Floor Square Footage – 17,300 SF (Pod I of IV ultimate)
Tier Level – Electrically- Tier III (upgradable to Tier IV), Mechanically – Tier IV, Tier III Upgrade currently in progress
Electrical Density – 146 watts/SF (based on net usable IT space)
UPS Configuration – Five (5) 750 KVA (N+1) modules connected in parallel redundant manner. Supports IT load and continuous cooling.
Generators – Three (3) 15kV, 2MW generators (N+2) connected to redundant generator paralleling gears (upgradable to twelve (12) 2MW generators); MCE is currently working on the design to add one (1) 2MW generator.
Chillers – Chiller plant including two (2) 1000-ton chillers (N+1) upgradeable to six (6) chillers; dual chilled water distribution piping; 290,000 gallons of thermal storage for 90 minutes of chilled water backup.
Cooling Towers – Two (2) 1000-ton cooling towers, each dedicated to an individual chiller lineup (N+1) upgradeable to six (6) cooling towers.