Mission Critical Project 1

Completion Date – Phase I – 2009
Square Footage (SF) – 16,500 SF data center and 16,500 SF support space
Raised Floor SF – 16,500 SF with future additional 16,500 SF
Tier Level – Electrically – N+1 Tier II, Mechanically – N+1 Tier II
Electrical Density – 115 watts/SF, Hot Aisle Containment Area
UPS Configuration – 2N Tier III, Three (3) 675KW each side 1500KW
Generators – N+1, Three (3) 2500KW, space for fourth generator
Cooling System – 23 CRAC units supplied by a chilled water piping loop and three (3) 500 ton ii. Centrifugal chillers with space to add fourth chiller. In-row coolers in Hot Aisle Containment (HAC) area.